Structures & Construction

From the structural assembly to the construction sequence.

A selection of modelling and documentation work connecting steel framing, reinforced concrete and construction details. Drawings show assemblies at different scales; a 4D simulation adds the sequence of work over time.

My role Modelling · Reinforcement · Documentation · Families & templates · 4D planning

Coordination With structural calculation engineering for steel and concrete work

4D tools Revit · MS Project · Navisworks

1 interactive 3D model   /   11 drawing sheets   /   1 construction-sequence film   /   Select any drawing to inspect the original

01

Steelwork & connections

From the overall framing arrangement to anchors and joints, model views and annotated drawings describe how the steel components come together.

Steel modelling · Anchors · Connection documentation

02

Concrete & reinforcement

Explore the concrete and reinforcement model, then examine structural assemblies, foundations and reinforcement through the drawing sheets below.

Concrete modelling · Reinforcement · Foundations

03

Construction details

Parapet, flat roof and louvre jamb details show the coordination of building envelope systems, materials and interfaces. Grill and kitchen drawings complete the selection.

System design · Detail drafting · LOD300/350 modelling · Supplier & contractor coordination

04

Construction in time

A 4D simulation brings the construction programme and building model together to communicate the sequence of work in an urban setting.

Revit → MS Project → Navisworks